How to apply for net metering connection?

Here is checklist for filing net metering applications:

  1. Distributed Generation Interconnection Agreement between Distributed
    Generator and Distribution Company (Schedule-I)
  2. Standard Distributed Generation Application Form For Distribution Company
    (Schedule-II)
  3. Application for grant of License National Electric Power Regulatory Authority
    (NEPRA) (Schedule-III)
  4. Application for Exemption from section 24 of the Act (Schedule-IV)
  5. Fee Schedule (Schedule-V)
  6. Affidavit (On non-judicial paper) (Schedule-VI)
  7. Generation License Template (Schedule-VII)
  8. Attested copy of CNIC.
  9. Copy of last paid electricity bill. (Name of applicant and name mentioned on
    electricity bill must be same).
  10. Technical Data of components including solar modules, invertors, etc.
  11. Schematic drawings, Single line diagram of the system.
  12. Site plan showing location of external disconnect switch.
  13. Inspection of Electrical Installation Certificate Signed by authorized Engineer of
    AEDB Certified Company as per direction of AEDB issued vide letter No. B/3/1/Net
    Met/09 dated 13-02-2018.

Note:

  1. Only consumers having 3 phase meters installed at their premises are eligible for net
    metering facility.
  2. Upto 5 kW capacity single phase inverters are allowed.
  3. If capacity of net metering facility is more than 5 kW then only 3 phase inverters are allowed.
  4. The inverters must be of grid-tied type.
  5. Maximum allowed capacity for net metering facility is 1.5 times of sanctioned load.
  6. Complete Application according to check list as mentioned above be submitted in office of
    Manager (Marketing & Tariff), LESCO HQ, 22-A, Queens Road, Lahore.

For Further details please visit:

Contact Numbers:

042-99204840, 0320-0520202, 0320-0520203, 0320-0520206, 0320-0520271,
0320-0520282 for information regarding Net Metering. 